Toyota Corolla + 1. Maintenance instruction + 2. Maintenance - 3. Engines - 3.1. Petrol engines - 3.1.1. Repair work without dismantle of the engine from the car 3.1.1.1. Specifications 3.1.1.2. Installation of the piston of the 1st cylinder in MW of a step of compression 3.1.1.3. Cover of a head of the block of cylinders 3.1.1.4. The soaking-up collector 3.1.1.5. Final collector 3.1.1.6. Gear belt 3.1.1.7. Forward epiploon of the crankshaft 3.1.1.8. Cam-shaft epiploon 3.1.1.9. Cam-shafts and pushers (engines of 1,3 l) 3.1.1.10. Cam-shafts and pushers (l engines 1,6 and 1,8) 3.1.1.11. Head of the block of cylinders 3.1.1.12. Oil pallet 3.1.1.13. Oil pump 3.1.1.14. Flywheel (or leading disk of the hydrotransformer) 3.1.1.15. Back epiploon of the crankshaft 3.1.1.16. Engine mount details + 3.1.2. Dismantle and capital repairs + 3.2. Diesel engine + 3.3. Electric equipment of the engine + 4. Cooling systems, heating + 5. Fuel, exhaust systems + 6. System of decrease in toxicity + 7. Transmissions + 8. Coupling and half shafts + 9. Brake system + 10. Suspension bracket and steering + 11. Body + 12. Electric equipment
|
Prevention
Works are performed on the cold engine.
Removal
PERFORMANCE ORDER |
1. Disconnect the battery from weight. |
|
2. Turn off five bolts of fastening (are specified by shooters) and remove the top heat-insulating screen from a collector. |
Prevention
The design provided also the lower screen which is attached to a collector from below and to remove it there is no need.
|
3. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with the getting liquid. After wetting turn off nuts of fastening of an exhaust pipe. |
|
4. Turn off the top bolt (the top arrow) of fastening of a rack of a final collector bolts of fastening of a rack of a collector (if it is provided by a design). Weaken an inhaling of two bolts of fastening of a rack of a collector to the block of cylinders (the lower shooters). |
|
5. Turn off nuts and bolts of fastening and remove a collector together with laying. |
|
Installation
PERFORMANCE ORDER |
1. Scrape off all remains of material of laying and adjournment of a deposit from demountable surfaces of a collector and a head of cylinders. If leak signs through laying are observed, check deformation of the demountable plane of a collector in a specialized workshop, if necessary a proshlifuyta. |
2. Put on hairpins of fastening of a collector to a head of cylinders new laying. Tags on laying have to be turned from a head of cylinders aside, and the arrow has to specify towards transmission. |
3. Establish a final collector and wrap bolts and nuts on former places. |
4. Tighten nuts and bolts in three-four receptions with the set moment (it is specified in subsection 3.1.1.1). Tighten bolts and nuts from the center to the periphery of a collector. |
5. Establish other details as it should be, the return to dismantling. |
6. Start the engine and check tightness of connections of a final collector. |
|
|
|